Boonville R-I — Missouri DNR Asbestos Records

Boonville R-I in Boonville, MO has 21 documented asbestos project notifications on file with the Missouri Department of Natural Resources under the NESHAP program.

Documented asbestos-containing materials (ACM) include: ceiling tile, floor tile, gaskets/packing, mastic, pipe insulation.

These are public regulatory records of licensed asbestos abatement and demolition/renovation work conducted at district facilities. Each notification represents a separate project where asbestos was identified and removed by a licensed contractor.

If you or a family member worked at, attended, or was otherwise present at facilities operated by Boonville R-I and has been diagnosed with mesothelioma, asbestosis, or another asbestos-related disease, these records may be relevant to a legal claim.


Missouri DNR Asbestos Notification Records

The following 21 project notification(s) are documented with the Missouri Department of Natural Resources (NESHAP program) for Boonville R-I in Boonville. These are public regulatory records.

Project IDYearSite / BuildingOperationACM RemovedContractor
668-971997Gymnasium, Kemper Military Academy P#799-1Renovation250 ln. ft. pipe insulation 8(D)&(I)Asbestos Removal Services, Inc.
2009P#0936 SS Peter & Paul Elementary School96sf+1890sf VAT/Mastic-1984/1964 S & Main HallwaysAsbestos Removal Services, Inc.
2012P#1251 Exterior Pipe Lineapprox. 160 lf Cat. II non-frbl pipe coatingAsbestos Removal Services, Inc.
2013P#1342 Pipeline Repairs behind Kentucky Fried Chicken20lf non-frbl pipe coating-parking lot behind Kentucky Fried ChickenAsbestos Removal Services, Inc.
6799-20142014Central Elementary SchoolDEMOLITION- (previously removed)Jeff Schneiders Construction Company
A6692-20152015Boonville High SchoolRenovation976sf frbl ceiling tileAsbestos Removal Services, Inc.
2015P#1530, David Barton Elementary School2700lf non-frbl window/door caulking-Exterior Doors & WindowsAsbestos Removal Services, Inc.
A6814-20152015Former Kemper Military School Administration BldgRenovation420sf frbl linoleum, 12919sf n-f flr tile, 9904sf n-f flr tile mstc, 635lf fr…Advanced Environmental Testing and Abatement, Inc.
2016P#1631 David Barton Elementary School-Rooms 112,113,2011480sf non-frbl VAT/mastic in Rooms 112 & 113Asbestos Removal Services, Inc.
2017P#1716-2 Job#J5S3145, Cooper County Bridge A-169132sf n-f insulating compounds under Tube Rail PostAsbestos Removal Services, Inc.
A7536-20172018Former Kemper Military School Administration BldgDemolition840sf frbl blr/tank insul,28650sf frbl ceiling txtr/drywll,2400sf frbl frprfn…Major Abatement & Demolition Inc.
2021P#2118, Boonville High School North Corridor3000sf n-f masticARSI, Inc.
2021P#2118-1 David Barton Elementary School500sf n-f VAT &masticARSI, Inc.
2021P#2118-2, Laura Speed Elliott Middle School, Booneville R-1 School District28lf frbl TSI pipe insulARSI, Inc.
2021P#2118-2, David Barton Elementary School Boiler room38ea frbl mudded fitingsARSI, Inc.
2022P#2175 ATT Store Basement24lf frbl TSIARSI, Inc.
A8406-20222022P#2239 David Barton Elementary SchoolRenovation240lf frbl TSI, 50sf frbl mudded fittingsARSI, Inc.
A8665-20232023Boonville R-1 Central Office WarehouseRenovation4200sf n-f VAT &masticARSI, Inc.
A8768-20242024David Barton Elementary SchoolRenovation15sf frbl pipe fittings, 11250sf n-f floor tile &mastic, 3600sf n-f chalkboardsGehm Environmental
A8887-20252025Former Kemper Military School Bldgs A and DRenovation2934lf frbl pipe, 53505sf n-f floor tile &mastic, 210sf n-f tar paper &mastic…Spectrum Environmental (Alloy Group)
A8872-20252025P#2359 David Barton Elementary School, Phase 2Renovation2400sf n-f floor tile &masticARSI, Inc.

Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement & Demolition/Renovation Notification Program — public regulatory records.


For informational purposes only. This page reproduces public regulatory data from the Missouri Department of Natural Resources. Contact a licensed attorney for legal advice.