Nevada R-V — Missouri DNR Asbestos Records
Nevada R-V in Nevada, MO has 25 documented asbestos project notifications on file with the Missouri Department of Natural Resources under the NESHAP program.
Documented asbestos-containing materials (ACM) include: ceiling tile, floor tile, floor tile mastic, friable ACM, linoleum.
These are public regulatory records of licensed asbestos abatement and demolition/renovation work conducted at district facilities. Each notification represents a separate project where asbestos was identified and removed by a licensed contractor.
If you or a family member worked at, attended, or was otherwise present at facilities operated by Nevada R-V and has been diagnosed with mesothelioma, asbestosis, or another asbestos-related disease, these records may be relevant to a legal claim.
Missouri DNR Asbestos Notification Records
The following 13 project notification(s) are documented with the Missouri Department of Natural Resources (NESHAP program) for Nevada R-V in Nevada. These are public regulatory records.
| Project ID | Year | Site / Building | Operation | ACM Removed | Contractor |
|---|---|---|---|---|---|
| 11191-2022 | 2022 | High School Stadum Press Box | Demolition | none | Dehn Demolition |
| 3175-2002 | 2002 | Nevada High School | Renovation | 13,000 sq. ft. ceiling tile. | Sunburst Group Inc. |
| 4720-2008 | 2008 | Nevada High School | Renovation | TSI, Floor Tile/Mastic | Forefront Environmental Services |
| 1775-98 | 1998 | Bryan Elementary School | Renovation | NON-NESHAP 24 cu. ft. ACM debris 8(A) | Nevada R-V School District |
| 3984-2005 | 2005 | Nevada Middle School | 288 sf linoleum, 2825 sf floor tile and mastic | Forefront Environmental Services | |
| 2007 | AT&T Nevada | 90 Sqft TSI | Global Environmental | ||
| 2010 | 3M-Nevada Plant, ARSI Project #0128 & #0128-2 | 20 lf frbl steam & plumbing pipe insulation | Asbestos Removal Services, Inc. | ||
| 2015 | 3M | 5sf frbl tank insulation,80lf frbl pipe insulation,20lf frbl mudded joint fttngs | B&R Insulation, Inc | ||
| 10178-2019 | 2020 | former First Baptist Church | DEMOLITION | roofing (unknown) | Coonrod Construction |
| 11081-2021 | 2022 | Franklin School Bldg | DEMOLITION | frbl insul paper, roof flashing (2sf, 38sf) | Zach Erwin Construction, Inc. |
| 2022 | P#2216-8 Bridges A1693S & A1693N | 16sf n-f insulated compound under 40 ea. Tube rail post | ARSI, Inc. | ||
| 2024 | P#2416 bridge over Drywood Crk WB | 33sf n-f insul compound | ARSI, Inc. | ||
| 2024 | P#2416 bridge over Drywood Crk | 33sf n-f insul compound | ARSI, Inc. |
Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement & Demolition/Renovation Notification Program — public regulatory records.
For informational purposes only. This page reproduces public regulatory data from the Missouri Department of Natural Resources. Contact a licensed attorney for legal advice.