R-7 School District — Missouri DNR Asbestos Records
R-7 School District in Lee’s Summit, MO has 8 documented asbestos project notifications on file with the Missouri Department of Natural Resources under the NESHAP program.
Documented asbestos-containing materials (ACM) include: boiler insulation, ceiling tile, drywall / joint compound, duct insulation, pipe insulation.
These are public regulatory records of licensed asbestos abatement and demolition/renovation work conducted at district facilities. Each notification represents a separate project where asbestos was identified and removed by a licensed contractor.
If you or a family member worked at, attended, or was otherwise present at facilities operated by R-7 School District and has been diagnosed with mesothelioma, asbestosis, or another asbestos-related disease, these records may be relevant to a legal claim.
Missouri DNR Asbestos Notification Records
The following 8 project notification(s) are documented with the Missouri Department of Natural Resources (NESHAP program) for R-7 School District in Lee’s Summit. These are public regulatory records.
| Project ID | Year | Site / Building | Operation | ACM Removed | Contractor |
|---|---|---|---|---|---|
| 10764-2021 | 2021 | Lee’s Summit High School | Demolition | unknown | AT Abatement Services, Inc. |
| 1710-98 | 1998 | Westview Elementary School | Renovation | 288 sq. ft. boiler insulation, 1,114 ln. ft. pipe insulation | Sunburst Group Inc. |
| 1704-98 | 1998 | Pleasant Lea Elementary School | Renovation | 8 sq. ft. boiler door, 342 ln. ft. thermal pipe insulation 8(D-I) | Sunburst Group Inc. |
| 3967-2005 | 2005 | Pleasant Lea School | 40000 sf ceiling tile | B&R Insulation Inc. | |
| 3962-2005 | 2005 | Meadow Lane Elementary | 1156 friable drywall | B&R Insulation Inc. | |
| 1728-98 | 1998 | Lee’s Summit Elementary School | Renovation | NON-NESHAP 12 sq. ft. boiler door refractory, 73 ln. ft. pipe insulation | Sunburst Group Inc. |
| 1729-98 | 1998 | Hazel Grove Elementary School | Renovation | NON-NESHAP 25 ln. ft. pipe insulation, 125 ln. ft. duct tape | Sunburst Group Inc. |
| 1779-98 | 1998 | Lee’s Summit Elementary School Project | Renovation | NON-NESHAP 112 sq. ft. TSI 8(A) | Sunburst Group Inc. |
Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement & Demolition/Renovation Notification Program — public regulatory records.
For informational purposes only. This page reproduces public regulatory data from the Missouri Department of Natural Resources. Contact a licensed attorney for legal advice.