Wentzville R-IV — Missouri DNR Asbestos Records
Wentzville R-IV in Wentzville, MO has 17 documented asbestos project notifications on file with the Missouri Department of Natural Resources under the NESHAP program.
Documented asbestos-containing materials (ACM) include: floor tile, floor tile mastic.
These are public regulatory records of licensed asbestos abatement and demolition/renovation work conducted at district facilities. Each notification represents a separate project where asbestos was identified and removed by a licensed contractor.
If you or a family member worked at, attended, or was otherwise present at facilities operated by Wentzville R-IV and has been diagnosed with mesothelioma, asbestosis, or another asbestos-related disease, these records may be relevant to a legal claim.
Missouri DNR Asbestos Notification Records
The following 12 project notification(s) are documented with the Missouri Department of Natural Resources (NESHAP program) for Wentzville R-IV in Wentzville. These are public regulatory records.
| Project ID | Year | Site / Building | Operation | ACM Removed | Contractor |
|---|---|---|---|---|---|
| A6004-2012 | 2013 | 2013 O&M Wentzville School District-Various Schools | OM | TBD | Midwest Service Group |
| A6145-2013 | 2013 | Heritage School (M13-29) | Renovation | 15000sf frbl floor tile & mastic | CENPRO Services, Inc. |
| A7915-2019 | 2019 | Heritage Primary School | Renovation | 4100sf frbl spray applied ceiling material | General Waste Services Inc. |
| 715-2004 | 2004 | Erker tract, 2 houses, 6 outbldgs | DEMOLITION | #3620-04, NO INSPECTION PROVIDED | Kuesel Excavating |
| 2010 | Wentzville Middle School, Job#M10-79 | 4800 Linear Feet Non-frbl Window Caulk | CENPRO Services, Inc. | ||
| 2012 | Holt High School | 24000sf non-frbl floor tile & mastic | Envirotech, Inc. | ||
| 2014 | Heritage Primary School & Heritage Intermediate School | 7392sf non-frbl floor tile/mastic | Talbert ICS, Inc. | ||
| 2014 | Holt High School | 2000sf non-frbl floor tile/mastic | Talbert ICS, Inc. | ||
| 2014 | Single Family Residence | 360sf frbl sheet flooring, 80sf frbl duct insulation | Advanced Environmental Services, Inc. | ||
| 2021 | General Motors Wentzville Assembly Center | <160sf insulating jacketing | Environmental Restoration LLC | ||
| 2022 | Residential Structure | 6cf frbl unused linoleum, 3sf frbl boiler door gasket, 600sf n-f mastic, 350s… | US Environmental Solutions LLC | ||
| 2022 | Residential Structure | 6cf frbl unused linoleum, 3sf frbl boiler door gasket, 600sf n-f mastic, 350s… | Cannon Excavation Co., LLC |
Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement & Demolition/Renovation Notification Program — public regulatory records.
For informational purposes only. This page reproduces public regulatory data from the Missouri Department of Natural Resources. Contact a licensed attorney for legal advice.