Windsor C-1 — Missouri DNR Asbestos Records
Windsor C-1 in Windsor, MO has 8 documented asbestos project notifications on file with the Missouri Department of Natural Resources under the NESHAP program.
Documented asbestos-containing materials (ACM) include: floor tile, mastic, pipe insulation.
These are public regulatory records of licensed asbestos abatement and demolition/renovation work conducted at district facilities. Each notification represents a separate project where asbestos was identified and removed by a licensed contractor.
If you or a family member worked at, attended, or was otherwise present at facilities operated by Windsor C-1 and has been diagnosed with mesothelioma, asbestosis, or another asbestos-related disease, these records may be relevant to a legal claim.
Missouri DNR Asbestos Notification Records
The following 8 project notification(s) are documented with the Missouri Department of Natural Resources (NESHAP program) for Windsor C-1 in Windsor. These are public regulatory records.
| Project ID | Year | Site / Building | Operation | ACM Removed | Contractor |
|---|---|---|---|---|---|
| 2662-2000 | 2000 | Windsor ,Kimmswick Facility Clean-up | Renovation | 10,000 sq. ft. ACM dust and debris, 10,000 sq. ft. floor tile and mastic | J & S Companies Inc. |
| 4328-2006 | 2006 | Kimmswick Campus-church, convent, rectory and garage | Demolition | Floor Sheeting, Seam Tape, Trowled ceiling, sink mastic, floor tile and mastic | Spray Services Inc. |
| 2548-2007 | 2007 | Kimmswick Campus | DEMOLITION | none (0) | Ahrens Contracting |
| 4716-2008 | 2008 | Kimmswick Campus-Latch Key Bldg | Renovation | Duct Wrap Insulation, Floor Sheeting | Spray Services Inc. |
| 4935-2011 | 2011 | Windsor Intermediate School | DEMOLITION | - A5406-2011 | TBD |
| A5406-2011 | 2011 | Windsor S.D.-Former Old 5th Grade Bldg | Renovation | 100sf contaminated soil, 11500sf floor tile/mastic, 1075 lf pipe insulation, … | Midwest Service Group |
| A7627-2018 | 2018 | Windsor Elementary School | Renovation | 600sf frbl floor tile/mastic, 200sf frbl boiler, 250lf frbl pipe insulation | Advanced Environmental Services, Inc. |
| A8676-2023 | 2023 | Intermediate Center Windsor School District | Demolition | 3000sf frbl acoustic ceiling, 8500sf n-f floor tile &mastic, 740sf n-f chalkb… | Environmental Operations, Inc. |
Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement & Demolition/Renovation Notification Program — public regulatory records.
For informational purposes only. This page reproduces public regulatory data from the Missouri Department of Natural Resources. Contact a licensed attorney for legal advice.