Mesothelioma Lawyer Missouri: Filing Deadline & Trust Fund Guide for School Workers
If you were just diagnosed with mesothelioma or asbestosis after years of working in Missouri school buildings, the clock is already running. Missouri law gives you 5 years from your diagnosis date to file an asbestos personal injury claim — not 5 years from when you were exposed, and not 5 years from when you first got sick. That distinction has cost workers their cases. An experienced mesothelioma lawyer Missouri can make sure it doesn’t cost you yours. Call today for a free consultation.
Occupational Asbestos Exposure in Missouri School Buildings
Workers who handled, cut, or disturbed asbestos materials during maintenance, installation, and renovation projects in Missouri school buildings are alleged to have faced substantial exposure risks, as documented by project records and regulatory filings.
Roosevelt High School Gymnasium Renovation (2015)
| Project ID | Date | Building | ACM Reportedly Removed | Contractor |
|---|---|---|---|---|
| A6542-2015 | 09/14/2015 | Roosevelt High School Gymnasium, St. Louis | 3,000 sf spray-applied fireproofing (Monokote); 10,000 sf ceiling tile | Midwest Environmental |
The 2015 renovation at Roosevelt High School reportedly included removal of 3,000 square feet of W.R. Grace Monokote spray-applied fireproofing from gymnasium structural beams, along with a significant quantity of asbestos-containing ceiling tiles. Boilermakers and pipefitters who worked near that spray-applied fireproofing may have been exposed to elevated fiber concentrations during disturbance activities. Insulators removing pipe insulation and duct wrap in the same facility may have faced comparable exposure scenarios.
Compton-Drew ILC Middle School HVAC Maintenance (2013)
| Project ID | Date | Building | ACM Reportedly Removed | Contractor |
|---|---|---|---|---|
| A6120-2013 | 02/18/2013 | Compton-Drew ILC Middle School, St. Louis | 1,500 lf duct wrap insulation | Abatement Pro Inc. |
In 2013, 1,500 linear feet of friable asbestos duct wrap insulation was reportedly removed from HVAC systems at Compton-Drew ILC Middle School. HVAC mechanics and maintenance workers who serviced those systems prior to abatement may have been exposed to asbestos fibers released during routine repairs. Workers in these roles are alleged to have faced direct inhalation exposure when cutting, fitting, or removing insulated ductwork — friable duct wrap releases respirable fibers with even minor disturbance.
Missouri’s 5-Year Filing Deadline: What You Need to Know
Under Mo. Rev. Stat. § 516.120, Missouri gives asbestos claimants 5 years from the date of diagnosis to file suit. A worker diagnosed with mesothelioma in 2025 has until 2030 to file — regardless of when exposure occurred decades earlier. That deadline is firm. Missing it means losing your right to compensation entirely, regardless of how strong your case is on the merits.
Where to File: Venue Strategy for Missouri Workers
St. Louis City Circuit Court
St. Louis City Circuit Court has handled asbestos dockets for decades. Missouri claimants — particularly those who lived or worked primarily in the city — often file here for its established procedures and familiarity with occupational exposure claims involving school building tradesmen.
Madison County, Illinois
Madison County sits just across the Mississippi River from St. Louis and is recognized nationally as one of the most plaintiff-favorable asbestos jurisdictions in the country. Its court has developed specialized procedures for managing large asbestos dockets efficiently. Missouri workers with exposure histories in both states, or those whose defendant manufacturers operated significantly in Illinois, may find meaningful strategic advantages here.
St. Clair County, Illinois
St. Clair County provides a third established venue option for Missouri claimants. Like Madison County, it maintains a robust asbestos docket and has extensive experience with bi-state occupational exposure cases.
Your asbestos attorney Missouri should evaluate venue based on where exposure occurred, where defendants operate, and where you currently reside — the right choice can affect both timeline and outcome.
Asbestos Bankruptcy Trust Funds: Recovery Beyond the Courtroom
Missouri mesothelioma and asbestosis victims may pursue claims against more than 60 asbestos bankruptcy trust funds at the same time as litigation. These trusts were established by bankrupt manufacturers to compensate victims and operate entirely independently from court proceedings.
What that means practically:
- Trust claims can be filed while your lawsuit is pending
- Payment does not require a trial verdict
- Many trusts offer expedited payment schedules
- Most funds have decades of assets remaining
Trust funds particularly relevant to school building exposure include those established by:
- W.R. Grace (spray-applied fireproofing)
- Johns Manville (pipe and duct insulation)
- Owens Corning (fiberglass and mineral wool products)
- Thermal Insulation Manufacturers Association (collective trust)
Trust filings must be coordinated with your litigation strategy. An experienced asbestos cancer lawyer St. Louis handles both tracks simultaneously to maximize total recovery.
Tradesmen at Highest Risk: Documented Exposure Scenarios
Boilermakers and Pipefitters
Workers in these trades are alleged to have been exposed when installing, maintaining, or removing asbestos pipe insulation in school boiler rooms and mechanical spaces. Cutting and fitting insulated piping put friable fibers directly into the worker’s breathing zone.
Insulation Specialists and Heat/Frost Insulators
Insulators who applied or removed pipe wrap, duct insulation, and spray-applied fireproofing reportedly experienced sustained exposure during both application and disturbance — frequently in confined spaces with limited ventilation.
HVAC Mechanics and Technicians
HVAC mechanics who serviced insulated ductwork, dampers, and equipment are alleged to have been exposed when cutting or modifying asbestos-containing materials during routine repairs and system upgrades.
Electricians and Millwrights
Electricians reportedly encountered incidental exposure working near spray-applied fireproofing and insulated conduit. Millwrights who relocated or modified machinery near asbestos-containing materials may have disturbed friable products in the process.
Maintenance Workers
Building maintenance staff are alleged to have faced cumulative exposure through repeated contact with deteriorating asbestos-containing materials during routine facility upkeep — work that rarely came with warnings or protective equipment in earlier decades.
Local Union Support and Resources
Missouri’s trades unions have been on the front lines of asbestos exposure documentation for their members:
- Heat and Frost Insulators Local 1 (St. Louis)
- UA Local 562 (Plumbers & Pipefitters)
- Boilermakers Local 27 (St. Louis area)
These locals have historically tracked exposure incidents, maintained member work records, and connected members with legal resources. If you suspect occupational asbestos exposure, contact your local — co-worker statements and union job records have supported asbestos claims for decades.
Your Next Steps
Gather documentation now. Employment records, union cards, payroll stubs, and any photographs of job sites that place you at specific facilities during specific timeframes are the foundation of your claim.
Get a free consultation with an experienced asbestos attorney Missouri. Bring your diagnosis paperwork and your work history. The consultation costs you nothing; waiting costs you time you may not have.
File within Missouri’s 5-year window. Your mesothelioma lawyer Missouri will confirm your diagnosis date, calculate your deadline, and file before it closes.
Pursue trust claims in parallel. Do not wait for trial. Trust fund claims can pay out while litigation is ongoing.
You spent decades building and maintaining schools in this state. The manufacturers who sold asbestos-containing products into those buildings knew the risks and said nothing. Your diagnosis is not the end of this story — but the window to act is open now. Call today for a free consultation with a mesothelioma lawyer Missouri.
Data Sources
Information about facility equipment, industrial materials, and occupational records referenced on this page is drawn from publicly available sources where applicable, including:
- EPA ECHO Facility Compliance Database — enforcement and compliance records for industrial facilities
- OSHA Establishment Search — federal workplace inspection history
- EIA Form 860 Plant Data — power plant equipment and ownership records (where applicable)
- Missouri Department of Natural Resources NESHAP asbestos notification records
- Published asbestos trial and trust fund records (publicly filed court documents)
If specific equipment or product claims in this article are sourced from a non-public database, the source is identified parenthetically within the text above.
Missouri DNR Asbestos Notification Records
The following 150 project notification(s) are on file with the Missouri Department of Natural Resources (NESHAP program). These are public regulatory records documenting asbestos abatement, demolition, and renovation work at this facility.
| Project ID | Year | Building / Site | Operation | ACM Removed | Contractor |
|---|---|---|---|---|---|
| 3505-9 St. Louis Avenue (to be demo-collapsing) | 225sf frbl pipe insulation, 75sf frbl tank insulation | MAB Environmental | |||
| 4024-26 Page Abatement | 200sf frbl duct wrap, 120sf non-frbl transite | MAB Environmental | |||
| 1324-26 Union (to be demo-collapsing) | 110lf frbl pipe insulation | MAB Environmental | |||
| 2924 Barrett Street (Residential) | 100sf frbl duct wrap,54sf n-f lnlm,238sf n-f flr tile, 70lf frbl duct seam tape | Z & L Wrecking Company | |||
| 7428 Vermont (house-will demo) | 50sf frbl duct wrap | MAB Environmental | |||
| A5428-2011 | 2011 | Boiler Room of Central VPA | Renovation | 5000sf frbl thermal system insulation/5000lf pipe insulation/200sf non-frbl f… | DJ Contracting Inc. |
| 2008 | P#0899-9 810 Center St, 201 St. Louis Ave | 40 lf frbl duct wrap,380 sqft roofng,275sqft VAT | Asbestos Removal Services, Inc. | ||
| 2011 | Cityview Apartments-Basement Boiler Room, Bldg 20 | 30 lf frbl 10" pipe insulation | GenCorp Services | ||
| 2011 | Lemay Pump Station (M11-186) | 14 lf frbl pipe insulation | CENPRO Services, Inc. | ||
| 2011 | John Cochran VAMC Bldg 1 Temporary SPD, Job M11-167 | 10500sf non-frbl floor tile/mstc, 2 lf frbl pipe insulation | CENPRO Services, Inc. | ||
| 5127-2011 | 2011 | B’Nai Brit Hlel | DEMOLITION | floor tile/mastic, gasket (Cat II-1400sf) | Spirtas Wrecking Company |
| 2011 | Jesuit Hall | 54sf frbl duct insulation | Talbert Industrial Commercial Services | ||
| 2012 | John Cochran Hospital-Bldg #6, Cage Washing Area | 100 linear feet frbl pipe insulation | Midwest Service Group | ||
| 2012 | Residence | 200 lf pipe insulation/100 lf boiler insulation | GEI (Global Environmental, Inc.) | ||
| 2012 | Northwest Academy of Law | 24 linear feet frbl pipe insulation | Brooks Environmental Service Technicians LLC | ||
| 2012 | Sumner High School | 5000sf non-frbl floor tile/mastic | Midwest Service Group | ||
| 2012 | Nestle Research South Lower Level | 50sf frbl pipe insulation | CENPRO Services, Inc. | ||
| 2012 | Trigen | 100000sf approx. frbl asbestos pipe debris | Advanced Environmental Services, Inc. | ||
| 2012 | Katsinas Construction | 379sf non-frbl floor tile, 240 lf frbl pipe insulation | Wellington Environmental | ||
| 2012 | Willie Mae Hamilton’s Residence | 100lf non-frbl ductwork tape located on seams | GEI (Global Environmental, Inc.) | ||
| 5586-2012 | 2012 | Former Hodgen Elementary | DEMOLITION | needs insp (removed under prior contract) | Ahrens Contracting, Inc. |
| 2012 | Residence at 2846 Accomac | 330sf frbl duct wrap insulation | Mosaic Construction Services, Inc. | ||
| 2012 | St. Elizabeth’s Academy | 50 lf frbl pipe fittings | Advanced Environmental Services, Inc. | ||
| 5585-2012 | 2012 | St. Mary & Joseph Parish-former School Building | DEMOLITION | A5667-2012_Advanced Environmental Services (removed under prior contract) | Ahrens Contracting, Inc. |
| 2012 | St. Louis University Law School | 125 lf non-frbl ACM pipe fittings, 100 lf non-frbl HVAC vibration cloth | GenCorp Services | ||
| 2012 | Southtown Apartments | 568 linear feet non-frbl asbestos coated pipe | Mosaic Construction Services, Inc. | ||
| 2012 | Kiener East Parking Garage | 140-180 lf frbl mudded pipe insulation (fittings) | Envirotech, Inc. | ||
| 2012 | Elantas PDG-Building 39 Piping (#33659) | 90 lf frbl pipe insulation | Wellington Environmental | ||
| 2012 | McKinley School | 90lf frbl pipe insulation | Advanced Environmental Services, Inc. | ||
| 2012 | Sumner High School | 120lf frbl pipe insulation | Brooks Environmental Service Technicians LLC | ||
| 2012 | Northwest Academy of Law | 180 lf frbl pipe insulation | Brooks Environmental Service Technicians LLC | ||
| 2012 | WUSM-Former Sushi Bar | 75sf frbl boiler insulation, 350 lf non-frbl roof flashing | Midwest Service Group | ||
| 2013 | A2764-11 3333 LaSalle & 3318 Chouteau (former CATCO Bldg | 247 lf frbl pipe insulation | Cardinal Environmental Operations | ||
| 2013 | A2862 St. Louis City Hall Lower Level Hallway | 28 lf frbl pipe insulation | Cardinal Environmental Operations | ||
| 2013 | Laclede I-64/South Taylor Ave @ Chouteau | 192lf non-frbl asbestos tar coated 24" pipe | Mosaic Construction Services, Inc. | ||
| 2013 | 4544 Pennsylvania Residence | 1 cubic yard asbestos pipe insulation | Maurice-Benjamin Company | ||
| 2013 | St. Louis University High School | 160lf frbl duct insulation, 70sf frbl floor sheeting | GenCorp Services | ||
| 2013 | Piccadilly | 1300sf non-frbl transite siding, 10lf frbl seam tape, 30lf frbl duct wrap | GenCorp Services | ||
| 2013 | Vacant former office and warehouse renovation | 3500sf n-f VAT/mastic, 10sf gasket mtrl on ductwindow glazing | Global Environmental Inc. (was D6114-20130 | ||
| 2013 | South Kingshighway Project | 1272sf non-frbl transite panels, 75lf/6lf frbl pipe insul/pipe joint insulation | Wellington Environmental | ||
| 2013 | Commercial Building | 128sf frbl ceiling tile,27cf frbl boiler debris,8362sf n-f flrtile/mstc,26lf clk | Abatepro, Inc. | ||
| 2013 | McRee | 60lf frbl ACM duct wrap | GenCorp Services | ||
| 6259-2013 | 2013 | Jewish College of Nursing | DEMOLITION | Removed under previous contract. | Ahrens Contracting, Inc. |
| 2013 | Former Single Family Residence | 150sf frbl duct insulation, 175lf frbl window caulking | Spirtas Wrecking Company | ||
| 2013 | Former Single Family Residence | 150sf frbl duct insulation, 175lf frbl window caulking | Advanced Environmental Services, Inc. | ||
| 2014 | 1600 N. Broadway | 45lf frbl pipe insulation | Envirotech, Inc. | ||
| 2014 | Forest Park Gas & Wash Building | 352sf non-frbl mastic, 15lf frbl pipe wrap, 420lf non-frbl roof flashing | Abatepro, Inc. | ||
| 2014 | 2 Residences | 10lf frbl duct tape, 170lf frbl duct wrap | Abatepro, Inc. | ||
| 2014 | Vacant Building at 3033 N. Euclid | 6lf frbl TSI, 2100sf non-frbl floor tile | Abatepro, Inc. | ||
| 2014 | Former Church | 110lf frbl pipe insulation | Abatepro, Inc. | ||
| 2014 | Vacant Building at 1414 N. 13th | 125sf non-frbl floor tile,125sf non-frbl linoleum, 5lf frbl duct wrap | Abatepro, Inc. | ||
| 2014 | Park Over The Highway (M14-31) | 80lf frbl pipe insulation | CENPRO Services, Inc. | ||
| 2014 | St. Louis Community College Forest Park | 5sf frbl tank insulation,30lf/26lf frbl pipe insulation/pipe insulation fittings | Envirotech, Inc. | ||
| 2014 | Mann Elementary School | 150lf frbl asbestos pipe fittings | General Waste Services Inc. | ||
| 2014 | City of St. Louis City Hall | 16lf frbl pipe insulation | Envirotech, Inc. | ||
| 2014 | AMEREN | 70lf frbl pipe insulation | CENPRO Services, Inc. | ||
| 2014 | Berra Park-Comfort Station | 15ea frbl mudded jnts,75lf frbl pipe insul,200sf n-f trnst pnls,84lf door caulk | MAB Environmental | ||
| 2014 | House at 3719 Texas (to be demo-collapsing) | 35lf frbl pipe insulation, 200sf non-frbl floor sheeting | MAB Environmental | ||
| 6832-2014 | 2014 | Laclede Garage/Warehouse/Training School | DEMOLITION | floor tile/astic, transite, TSI, window caulk (1450 lf, 1036 sf, 5 windows) | Spirtas Wrecking Company |
| 2014 | 1919 South Grand (Apartment) | 96sf frbl plaster, 10lf frbl pipe insulation | Envirotech, Inc. | ||
| 6868-2014 | 2014 | Two story power house | DEMOLITION | - | Marschel Wrecking |
| 2015 | Former American Heart Association | 32sf frbl pipe insul,5200sf nf flr tile/mstc,90lf nf roofing,20lf nf trnst pipe | Midwest Service Group | ||
| 2015 | Carondelet Park-Comfort Stations Upgrades | 14ea frbl pipe chase,40sf/30lf frbl pipe ACM debris/insul,72lf door clk,35lf ext | MAB Environmental | ||
| 2015 | Residence | 936sf non-frbl floor tile/mastic, 1.5sf non-frbl duct seam tape | Crossroads Construction Services, Inc. | ||
| 2015 | Empty Lot | 120sf frbl boiler insulation | Universal Abatement, Inc. | ||
| 2015 | House (to be demo) | 936sf floor tile/mastic, 20lf duct seam tape, caulking on 15 windows/3 doors | Ahrens Contracting Inc. | ||
| 2015 | Multi-Family Home | 200lf frbl pipe insulation | GenCorp Services | ||
| 2015 | Mother of Good Counsel | 4lf frbl boiler gasket | Envirotech, Inc. | ||
| 2015 | Wyman Elementary School (14-0-584) | 80sf frbl fireproofing | Midwest Service Group | ||
| 2015 | The Park Frontenac Building | 30lf frbl TSI, 80sf non-frbl wall pucks, 384lf non-frbl door caulking | Envirotech, Inc. | ||
| 2015 | Hawthorn School for Girls (Job# M15-41) | 140sf non-frbl ceiling tile mastic | CENPRO Services, Inc. | ||
| 2015 | Rosati Kain High School | 2960sf nf carpet w/adhesive,1840sf nf flr tile/mstc,112lf nf cove base w/adhsv | Envirotech, Inc. | ||
| 2015 | TUMS (Job# M15-42) | 130sf frbl tank insulation | CENPRO Services, Inc. | ||
| 2015 | BJC-Mallinckrodt Bldg | 140lf frbl asbestos containing pipe insulation | Spray Services, Inc. | ||
| 2015 | BJC-Queeny Tower | 25lf frbl pipe fittings, 4lf frbl valves | Spray Services, Inc. | ||
| 2015 | 4753-55 Newberry Terrace (house to be demo) | 25sf frbl duct wrap | MAB Environmental | ||
| 2015 | Residence (collapsing-will demo) | 140sf non-frbl duct wrap | Brooks Environmental Service Technicians LLC | ||
| 2015 | Cathedral Basilica | 50lf frbl pipe fitting insulation | Envirotech, Inc. | ||
| 2015 | 5602 & 5580 W. Florisssant Avenue (2 residences) | 30sf frbl duct wrap, 1000sf n-f 9" floor tile mastic | Z & L Wrecking Company | ||
| 2015 | House | 60sf frbl boiler insul,300lf frbl pipe insul,643sf n-f flr tile on wood(no mstc) | GenCorp Services | ||
| 2015 | South City Baptist Church | 180lf frbl pipe insulation | Wellington Environmental | ||
| 2015 | Single Family Residence (will demo) | 400sf n-f transite-gabled side, 200lf n-f seam tape, 150lf n-f duct wrap | Z & L Wrecking Company | ||
| 2016 | VA John Cochran Hospital-Chilled Water (15-0-645) | 175lf frbl pipe/pipe fttng insul,14 mudded pipe fttngs, 12-16 black tar fttngs | Midwest Service Group | ||
| 2016 | P#1660-1 Missouri School for the Blind | 10ea asbestos-containing mudded pipe insulation-Bathrooms | Asbestos Removal Services, Inc. | ||
| 2016 | Carnahan Courthouse, Room 218 | 10lf frbl pipe insulation | Envirotech, Inc. | ||
| 2016 | Engineers Club of St. Louis | 8lf non-frbl thermal system insulation | Crossroads Construction Services, Inc. | ||
| 2016 | Cote Brilliante Presbyterian Chuch (church will be demo) | 25sf frbl duct wrap | Brooks Environmental Service Technicians LLC | ||
| 2016 | Residence | 50sf frbl duct wrap | Z & L Wrecking Company | ||
| 2016 | Residence (will demo) | 285sf frbl duct wrap/linoleum | Z & L Wrecking Company | ||
| 2016 | Residence (will demo) | 9sf frbl duct wrap & paper material | Z & L Wrecking Company | ||
| 2016 | Bishop DuBourg High School | 3200lf non-frbl window caulk | GEI (Global Environmental, Inc.) | ||
| 2016 | Missouri Botanical Gardens | 37512sf nf trnst pnls,6060sf nf wndw clk,870sf nf flrtile/mstc,120lf nf fluepipe | Crossroads Construction Services, Inc. | ||
| 2016 | 6230 Waterman Blvd. (Residence) | 180lf frbl pipe insulation | Envirotech, Inc. | ||
| 2016 | 1430 Olive (Office) | 80sf frbl pipe insulation, 6800sf non-frbl floor tile/mastic | Envirotech, Inc. | ||
| 2016 | St. Louis the King School | 65sf non-frbl floor tile/mastic | Envirotech, Inc. | ||
| 2016 | Residence (will demo) | 15sf frbl duct wrap (basement), 1200sf non-frbl transite siding | Z & L Wrecking Company | ||
| 2016 | Single Family House (will demo) | 32lf non-frbl duct wrap | NJW Construction Corp. | ||
| 7969-2016 | 2016 | DEMOLITION | Window Glazing, Floor Tile, Mastic, Pipe Insulation (WG-30ea., FT-350sf., M-7… | Bellon Salvage & Rehabbing | |
| 2016 | United States Post Office | 20lf frbl pipe insulation-Room 1130 | Wellington Environmental | ||
| 2016 | P#1621-2 St. Louis of France Church Basement Crawl Space | 10lf frbl duct wrap-basement crawl space | Asbestos Removal Services, Inc. | ||
| 2016 | Forest Park Administration Building | 100sf frbl tank insulation, 12lf frbl pipe insulation, 50lf frbl pipe fittings | Envirotech, Inc. | ||
| 2016 | 7600 Hall Street | 100sf frbl surface insulation | Envirotech, Inc. | ||
| 2016 | Residential | 70sf frbl duct wrap | Z & L Wrecking Company | ||
| 2016 | Montclair | 7lf frbl asbestos pipe insulation | Wellington Environmental | ||
| 2016 | Paraquad 5240 Oakland Avenue | 55lf frbl 3" pipe insul, 22lf frbl 6" pipe insul, 14ea mudded fttng joints | Crossroads Construction Services, Inc. | ||
| 2017 | Vacant Commercial Building | 10sf frbl fire brick doors, 70sf frbl boiler insul, 2070sf n-f floor tile/mastic | Envirotech, Inc. | ||
| 2017 | 6900 N. Broadway | 140lf frbl TSI pipe | Crossroads Construction Services, Inc. | ||
| 2017 | Wohl Community Center | 100lf frbl pipe insulation in gymnasium | Envirotech, Inc. | ||
| 2017 | Fairground Swimming Pool Renovation | 130sf frbl tank insul,6000sf n-f roofng mtrl,32lf n-f door clk,8lf nf trnst pipe | Gateway Construction Services, Inc. | ||
| 2017 | 1021-29 South Grand Blvd. | 45sf frbl insul paper,270sf windows-glzng,270sf wndws/3doors-clk,100lf blr clk | Envirotech, Inc. | ||
| 2017 | Residence (will demo) | 10sf frbl duct wrap | Z & L Wrecking Company | ||
| 2017 | House | 150lf frbl pipe insulation, 100sf n-f floor tile/mastic | Gateway Construction Services, Inc. | ||
| 2017 | Vacant Residence@4915 Geraldine Avenue (will demo) | 175lf frbl pipe insulation | Z & L Wrecking Company | ||
| 2017 | New Testament Christian Church | 130sf n-f floor tile, 4lf frbl thermal systems pipe insulation | Crossroads Construction Services, Inc. | ||
| 2017 | Killark Electric (17-0-155) | 160lf frbl TSI | Midwest Service Group | ||
| 2017 | Vacant Office Space | 200lf frbl TSI (behind lead contaminated ceramic tile) | GEI (Global Environmental, Inc.) | ||
| 2017 | Hyde Park-Renovation Recreation building | 17lf/76lf frbl ext door/wndw clk,100lf frbl fence clk,57lf frbl pipe ins/mudfttg | MAB Environmental | ||
| 2017 | 412 South Sarah Street (17-0-329) | 80sf frbl tank insulation, 4950sf n-f transite, door caulk (33 windows/9 doors) | Midwest Service Group | ||
| 2017 | Vacant House at 6452 Nashville | 85sf frbl duct wrap, 3800sf n-f transite diding, 400lf n-f window caulking | Abatepro, Inc. | ||
| 2017 | Pump Room (M17.97) | 60sf frbl tank insulation,60sf n-f vermiculite,50lf frbl pipe fttg/hangar insul | CENPRO Services, Inc. | ||
| 2017 | Residence (will demo) | 2sf frbl duct wrap | Z & L Wrecking Company | ||
| 2017 | Residence (will demo) | 2sf frbl duct wrap | Z & L Wrecking Company | ||
| 2017 | Residence (will demo) | 340sf frbl duct wrap | Z & L Wrecking Company | ||
| 2017 | Residence (will demo) | 8sf frbl duct wrap | Littles Wrecking Company II | ||
| 2017 | AMEREN General Office Building | 150lf frbl pipe insulation and pipe fittings | CENPRO Services, Inc. | ||
| 8817-2017 | 2017 | window caulk (none given) | Marschell Wrecking | ||
| 2017 | Residence (will demo) | 40sf non-frbl duct wrap/tape | Z & L Wrecking Company | ||
| 2018 | Mendenhall Bldg | 1900sf n-f floor tile, 145sf n-f pipe wrap, 400lf n-f window caulk | Hillsdale Demolition Contracting | ||
| 2018 | Residence (will demo) | 180sf frbl duct wrap, 400sf non-frbl floor tiel | Z & L Wrecking Company | ||
| 2018 | 6682 Oakland Avenue (Vacant Residential) | 175lf frbl TSI | Hunt Vac Services | ||
| 2018 | South City Catholic Academy (18-0-170) | 800sf non-frbl floor tile/mastic | Midwest Service Group | ||
| 2018 | Residence@1826 Warren (will demo) | 15lf frbl pipe insulation | Z & L Wrecking Company | ||
| 2018 | Elantas PDG-Reactor | 40sf frbl flue insulation, 85lf frbl TSI fittings | Midwest Service Group | ||
| 2018 | 4027 Winnebago (house to be demo) | 70lf frbl duct tape, 150lf non-frbl caulk | Abatepro, Inc. | ||
| 2018 | Single Family Residence | 2sf frbl duct wrap | B & D Wrecking | ||
| 2018 | Residence@4933 Geraldine (abate 6/28-29,demo 6/29-7/30) | 6sf frbl duct wrap, 300lf frbl window caulk | Z & L Wrecking Company | ||
| 2018 | Berthold Avenue | 150lf frbl asbestos pipe knuckles | GenCorp Services | ||
| 2018 | Vacant Residence (abate 10/15, demo 10/15-11/15) | 125sf frbl duct wrap | Z & L Wrecking Company | ||
| 2018 | 408 North Sarah | 10sf frbl vbrtn dmpnr,15sf frbl sht flrng,15lf frbl TSI,6624sf/40lf nf ftile/clk | Hunt Vac Services | ||
| 2018 | SLU-ISE Building | 400lf n-f transite pipe (abandoned water line duct bank) | Environmental Operations, Inc. | ||
| 2019 | Metropolitan Community Church of Greater St. Louis | 25lf frbl pipe fittings | Environmental Operations, Inc. | ||
| 2019 | BMO Harris Bank (section for demolition) | 67lf frbl pipe insulation, 5000sf non-frbl floor tile | Wellington Environmental | ||
| 2019 | Anhueser Busch-Building 207 (CENPRO Job#: ABP19-4) | 1675sf floor tile/mastic, 74lf window/door caulk, 60sf duct coating | CENPRO Services, Inc. | ||
| 2019 | St. Louis Community College Forest Park (M19-30) | 4800sf n-f floor tile/mastic, 110lf frbl pipe fitting insulation | CENPRO Services, Inc. | ||
| 2019 | Vacant Residence (abate 5/29-31, demo 5/29-7/29) | 15sf frbl duct wrap. | Z & L Wrecking Company | ||
| 2019 | 1601 Olive Street | 8990sf flrtl/mstc,2425sf ylw mstc,400sf blk mstc,1000sf mstc,50lf frbl pipe insl | Advanced Environmental Services, Inc. | ||
| 2019 | SLU 3225 Vista | 20sf frbl duct wrap, window glazing-13 windows | Crossroads Construction Services, Inc. | ||
| 2019 | Vacant Residence (abate 7/29, demo 7/29-9/30) | 2sf frbl duct wrap | Z & L Wrecking Company | ||
| 2019 | Du Bourg House | 200lf frbl pipe insulation, 10cf frbl boiler | Wellington Environmental | ||
| 2019 | 1150 South 3rd Street | 20sf n-f floor tile, 185lf frbl TSI, 50lf n-f window caulk | Midwest Service Group |
Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement Program — public regulatory records.
For informational purposes only. Not legal advice. No attorney-client relationship is created by reading this page. © 2026 Rights Watch Media Group LLC — Disclaimer · Privacy · Terms · Copyright